The Gymnastics Centre opened in September 2011. The £2.8m project started in January 2011 and was constructed by Kier Eastern.
The centre is fully equipped to Olympic standard and has foam filled pits, asymmetric bars/high bar, rings, parallel bars, beams, pommel horse, fast track, tumble track, vaulting track, two floor level trampolines with rig, a sprung floor area, wall bars and mirrors.
Keith Nicholls, Director of Sportspark in 2011, said: “This building will be fully sustainable and is very eco friendly. The wood used is from a sustainable source and there is no waste from the manufacturers. The cladding added to the outer walls of the building provides excellent insulation.”